太粗太长弄死了我了

    <tbody id="csdnw"></tbody><rp id="csdnw"></rp>
    <dd id="csdnw"></dd>
  1. <em id="csdnw"></em>
  2. <em id="csdnw"><tr id="csdnw"></tr></em><em id="csdnw"><strike id="csdnw"></strike></em>
    
  3. Latest News 2014

    Latest News - Last Updated 16/05/2014

    Hay Point Expansion Phase 3

    Meales Concrete Pumping Brisbane with assistance from Meales Concrete Pumping Mackay will provide concrete to the Dolphins via a Shwing BP1500 Stationary Pump through a Schwing Placing Boom on a Ballast frame. The Placing Boom will need dismantling continuously throughout the project during every pour break.

    Click to enlarge photos.

     

    New Jun Jin 53 Heading to Darwin 22/04/2014

    With Contract work steadily feeding the Darwin Region, the need for a few larger reach Booms were required to satisfy the requirements of the larger pours

    Meales today has taken delivery of a new 53M Jun Jin Mobile Pump. The JXRZ52 is a 5 stage Z Fold Boom with a Pump module capable of 158 mp/h making this the perfect long reach high output pump for the region.

    Click to enlarge photos.

     

     
     
    © 2018 Meales Concrete Pumping All Rights Reserved. Site Map
    太粗太长弄死了我了

      <tbody id="csdnw"></tbody><rp id="csdnw"></rp>
      <dd id="csdnw"></dd>
    1. <em id="csdnw"></em>
    2. <em id="csdnw"><tr id="csdnw"></tr></em><em id="csdnw"><strike id="csdnw"></strike></em>